Page 2194 - Week 06 - Thursday, 8 June 2017
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video
Auzpicious Arts
Bamstone
Blasted Glass Designs
Canberra Glassworks
Craig & Susan Barnes (Jim’s Mowing)
Cribb’s Contracting
David Jensz
DesignCraft
Don’t Panic Plumbing
Ecowise
EP Electrical Services
Eric Martin and Associates
Geoff Farquhar-Still
Harris Hobbs Landscapes
HUB Group
Imaage LED Lighting
International Conservation Services
Kon Dimopoulos
Mag Welding Services
Matthew Harding
Nott Just Mowing
Philip Spelman Sculpture
Programmed Property Services
Pyramid Corporation P/L
Redbox Design Group
Sellick Consultants
Sound Advice
Tim Hodge Stonemason Sculptor
Undercut Enterprises
(5) The program for repairs and maintenance for artworks is documented by the artist in an artwork maintenance manual. Requirements for reactive maintenance (such as graffiti removal) are assessed on an as-needs basis by Cultural Canberra with input from artists and artwork conservators as required.
(6) Refer total repairs and maintenance expenditure listed in (2). Public art repairs and maintenance expenditure is recorded in total figures to enable reporting against the budget allocation.
(7) The funding source for non-routine repairs and maintenance is the same for routine repairs and maintenance and is as provided in the budget papers.
(8) The nature of the work done for those years listed in part (6) included non-routine tasks such as graffiti and sticker removal, repair of vandalised works, electrical repairs (lighting), consultant advice as required, repair of damaged artwork plinth or surrounding pavement, treatment of rust and repair of subsurface drainage.
(9) Refer (4) above.
(10)
a. |
Refer table below. |
b. |
Refer table below. |
c. |
Refer table below. |
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video