Page 2194 - Week 06 - Thursday, 8 June 2017

Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video


Auzpicious Arts

Bamstone

Blasted Glass Designs

Canberra Glassworks

Craig & Susan Barnes (Jim’s Mowing)

Cribb’s Contracting

David Jensz

DesignCraft

Don’t Panic Plumbing

Ecowise

EP Electrical Services

Eric Martin and Associates

Geoff Farquhar-Still

Harris Hobbs Landscapes

HUB Group

Imaage LED Lighting

International Conservation Services

Kon Dimopoulos

Mag Welding Services

Matthew Harding

Nott Just Mowing

Philip Spelman Sculpture

Programmed Property Services

Pyramid Corporation P/L

Redbox Design Group

Sellick Consultants

Sound Advice

Tim Hodge Stonemason Sculptor

Undercut Enterprises

(5) The program for repairs and maintenance for artworks is documented by the artist in an artwork maintenance manual. Requirements for reactive maintenance (such as graffiti removal) are assessed on an as-needs basis by Cultural Canberra with input from artists and artwork conservators as required.

(6) Refer total repairs and maintenance expenditure listed in (2). Public art repairs and maintenance expenditure is recorded in total figures to enable reporting against the budget allocation.

(7) The funding source for non-routine repairs and maintenance is the same for routine repairs and maintenance and is as provided in the budget papers.

(8) The nature of the work done for those years listed in part (6) included non-routine tasks such as graffiti and sticker removal, repair of vandalised works, electrical repairs (lighting), consultant advice as required, repair of damaged artwork plinth or surrounding pavement, treatment of rust and repair of subsurface drainage.

(9) Refer (4) above.

(10)

a.

Refer table below.

b.

Refer table below.

c.

Refer table below.


Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video