Page 1796 - Week 06 - Thursday, 30 July 2020
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video
d) William Slim Drive Duplication -
Works include:
• Approx. 3.2km of new carriageway;
• Approx. 6.4km of new on-road cycle lanes / hard shoulder;
• Reconfiguration of existing intersections, including:
o Ginninderra Drive
o Dumas Street
o Baldwin Drive
o Owen Dixon Drive; and
o Chuculba Crescent.
• Signalisation of the Dumas Street intersection;
• Barrier replacements at bridges along the corridor;
• New bus bays and relocation of existing bus bays;
• Construction of linkages to existing community shared paths
• Street lighting;
• New and augmented stormwater systems, including levee bank at the existing underpass; and
• Landscaping.
e) Southern Cross Drive/Starke Street - Works involve the installation of new traffic signals which will provide controlled right turn and through movements at the intersection and associated road pavement widening;
Launceston Street/Irving Street - Works involve:
• the installation of new traffic signals at the intersection of Launceston/Irving providing a controlled pedestrian crossing across Launceston Street.
• Zebra crossing on the slip-lane from Irving Street to Launceston Street.
• Continuation of the existing median island closing the right turn into Furzer Street from Launceston Street, and the right turn out from Furzer Street to Launceston Street. This will convert Furzer Street into a left turn in and left turn out arrangement; and
• Creation of a formalised right turn queue lane for the right turn from Launceston Street into Bowes Street.
Belconnen Way/Springvale Drive - Works involve the conversion of the existing intersection arrangement into traffic signals and the potential realignment of slip-lane arrangements into and out of Springvale Drive to ensure safer operation with the new traffic signal arrangement.
Mt Taylor - Works involve the Feasibility Study for the upgrading of the Mt Taylor and Sulwood Drive Intersection including the developing of design options for the Mt Taylor Car Park extension and a new shared path along Sulwood Drive between Drakeford and Athllon Drive.
Hume Circle - Works involve the Feasibility Study for the upgrading of Hume Circle.
Kent/Novar Street intersection upgrades - This project involves the detailed design and construction of upgrades to three intersections on Kent Street/Novar Street.
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video