Page 342 - Week 01 - Thursday, 13 February 2020
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video
Table 4 - Calvary Public Hospital Bruce – 2016-17 | |
Principal Procedure |
Avg Cost per Procedure |
4270204-Extracapsular extraction of crystalline lens by phacoemulsification and aspiration of cataract with insertion of foldable artificial lens |
$2,912 |
9555003-Allied health intervention, physiotherapy |
$6,236 |
9619909-Intravenous administration of pharmacological agent, other and unspecified pharmacological agent |
$1,914 |
3209300-Fibreoptic colonoscopy to caecum, with polypectomy |
$2,688 |
3047301-Panendoscopy to duodenum with biopsy |
$3,840 |
9555002-Allied health intervention, occupational therapy |
$7,020 |
9619900-Intravenous administration of pharmacological agent, antineoplastic agent |
$2,340 |
9555001-Allied health intervention, social work |
$6,334 |
3209000-Fibreoptic colonoscopy to caecum |
$2,475 |
9555009-Allied health intervention, pharmacy |
$5,025 |
9555012-Allied health intervention, pastoral care |
$6,221 |
9048100-Suture of first- or second-degree tear of perineum |
$4,774 |
3681200-Cystoscopy |
$1,467 |
9555000-Allied health intervention, dietetics |
$9,365 |
3057200-Laparoscopic appendicectomy |
$7,289 |
1652003-Emergency lower segment caesarean section |
$12,235 |
1652002-Elective lower segment caesarean section |
$10,208 |
3564000-Dilation & curettage of uterus [D&C] |
$3,088 |
3683301-Endoscopic removal of ureteric stent |
$2,164 |
1370602-Administration of packed cells |
$5,565 |
Canberra Hospital—hydrotherapy pool
(Question No 2822)
Mrs Dunne asked the Minister for Health, upon notice, on 29 November 2019:
(1) During (a) 2017-18, (b) 2018-19 and (c) 2019-20 (to the date on which this question was published in the Questions on Notice Paper), (i) what upgrades, improvements, changes or other modifications (upgrades) were made to or are in progress at the hydrotherapy pool and any associated infrastructure or equipment at The Canberra Hospital (the pool), (ii) what is the cost of each element of the upgrades, (iii) what is the purpose of the upgrades, (iv) how and to what extent will the functionality of the pool be improved by the upgrades, (v) following the upgrades, what now is the life expectancy of the pool and (vi) how and to what extent is user access to or other use of the hydrotherapy pool itself enhanced.
(2) As at the date on which this question was published in the Questions on Notice paper (a) what upgrades, improvements, changes or other modifications (upgrades) are planned for the hydrotherapy pool and any associated infrastructure or equipment at The Canberra Hospital (the pool), (b) what is the budget or, if relevant, estimated cost, for each element of the upgrades cost, (c) why are the upgrades required, (d) what differences will the upgrades make to the functionality of the pool, (e) what difference will the upgrades make to the life expectancy of the pool and (f) what differences will the upgrades make to user access to or other use of the hydrotherapy pool itself.
Ms Stephen-Smith: The answer to the member’s question is as follows:
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video