Page 2321 - Week 06 - Thursday, 6 June 2019

Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video


Bandjalong Crescent, Aranda

40 Gingana Street, Aranda

26 Kesteven Street, Florey

Coulter Drive (behind 9 Gatliff Place), Florey

William Hovell Drive at turn into Kama Nature Reserve, Molonglo Valley

William Hovell Drive South of Drake Brockman Dr, Hawker

21 - 25 Earle Place, Page

25 Earle Place, Page

Coulter Drive intersection at 2 Ogilby Crescent, Page

Spalding Street, Flynn (at 2 Flierl Place)

Kingsford Smith Drive - opposite bus stop 4570, Flynn

13 Fitzherbert Place, Bruce

Braybrooke Street, Bruce

Haydon Drive, Bruce - adjacent bus stop 4803 (opposite Calvary Hospital)

Coulter Drive, Hawker - southbound just before William Hovell Drive

William Hovell Drive, Hawker - behind 13 Florina Place

Roads—resurfacing
(Question No 2438)

Mrs Kikkert asked the Minister for Roads, upon notice, on 5 April 2019:

(1) How long do cold mix asphalt road repairs typically last as an interim repair before a more permanent repair needs to be made.

(2) What is the average cost of a cold mix asphalt road repair.

(3) How many cold mix asphalt interim road repairs are currently in place in the Ginninderra electorate and where are they located.

(4) Are there any detailed policies or guidelines in place for determining the most suitable repair (i.e. weighing of specific timeframes/cost/treatment performance/location and traffic etc.), or is the determination made by the contracted repairers; if the former, can the policy or guidelines be submitted as an attachment; if the latter, what is the process of obtaining Government approval for a particular road repair.

Mr Steel: The answer to the member’s question is as follows:

(1) The durability of cold mix repair depends on a range of factors including the condition of the underlying pavement

(2) The cost of each pothole repair is approximately $60.

(3) The total number of sites currently identified for asphalt structural repair for the Ginninderra Electorate is 53 as at 11 April 2019. The locations are at Attachment A.

(4) Road inspections are undertaken using Pavement Visual Inspection Manual. The documents are at Attachment B.