(2)

Burn Name and ID

Area Burnt (ha)

Commencement Date

Jerrabomberra Wetlands NR

2

07/03/2018

Piccadilly, Brindabella Road Namadgi NP

319.63

08/03/2018

Blue Range, north of the Lower Cotter

114.32

08/03/2018

Jerrabomberra Grasslands NR

33.01

09/03/2018

Cooleman Ridge NR

12.86

09/03/2018

Gungaderra Grasslands NR

9.96

10/03/2018

East Dunlop, Belconnen

8.96

10/03/2018

Mulanggari NR

8.85

10/03/2018

Potters Hill, southern Namadgi NP

678.58

10/03/2018

Dunlop Grasslands NR

7.23

11/03/2018

Kama NR South

5.85

11/03/2018

Oakey Hill NR

10.23

12/03/2018

Aranda Spine, adjacent to Aranda NR

1.25

14/03/2018

FB352 Fairfax St, O’Connor

1.65

14/03/2018

Wildflower Triangle, Aranda

4.45

14/03/2018

Aranda Spine East, adjacent to Aranda NR

0.81

16/03/2018

Catherine Park, Molonglo River NR

10.27

04/04/2018

Molonglo River Corridor, Coombs - Patch K

9.58

04/04/2018

Pinnacle NR

16.96

17/04/2018

Pine Island, Murrumbidgee River Corridor

8.55

17/04/2018

Radford College, Bruce

5.12

20/04/2018

Mt. Rogers, Spence

9.81

21/04/2018

Wallaby Rocks, Tidbinbilla NR

12.56

22/04/2018

Barry Drive, Belconnen

17.62

26/04/2018

Devil’s Gap, Tidbinbilla NR

309.71

28/04/2018

Little Black Mountain, Black Mtn NR

15.86

02/05/2018

Black Mountain Tower

3.94

02/05/2018

NR – Nature Reserve

NP – National Park

(3) None of the uncompleted burns were conducted prior to the beginning of this year’s bushfire season, noting the Commissioner for Emergency Services has declared an early start to the season, commencing 1st September 2018.

A total of eight planned burns from the 2017-18 BOP (see below) have been unable to be implemented thus far in 2018 - three located in the higher alpine regions of the ACT as well as two cultural, two ecological and one urban burn.

EPSDD will not contemplate the delivery of burns where they cannot be safely executed or delivered in a way where objectives cannot be met. The eight planned