Page 2270 - Week 06 - Thursday, 7 June 2018
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video
Building Surveyor (Certifier)
2.2.4 |
issuing improper building approval—building work would contravene law because of external design or siting |
2.2.3 |
failure to mark, attach or annotate building approval required detail on approved plan |
2.2.2 |
failure to issue required building approval, or issue of unauthorised building approval |
2.2.9 |
failure to notify registrar of known contravention of building approval or development approval |
43(4) |
Any other breach where a demerit ground is not identified |
Electrician
2.4.1 |
inadequate or no protection against direct contact with live parts |
2.4.4 |
inadequate or no protection against fire spread |
2.4.12 |
creation of switchboard in noncompliant location |
2.4.13 |
creation of switchboard with protective device defect |
2.4.14 |
creation of switchboard with isolating device defect |
2.4.15 |
creation of switchboard with connective device defect |
2.4.16 |
creation of switchboard with connection defect or fixing of wiring or switchgear defect |
2.4.17 |
creation of switchboard with labelling identification defect or labelling electrical equipment defect |
2.4.19 |
creation of wiring system with conductor size defect |
2.4.20 |
creation of wiring system with cable core identification defect |
2.4.21 |
creation of wiring system with inadequate or no support or fixing |
2.4.22 |
creation of wiring system with connection or enclosure defect |
2.4.25 |
failure to protect wiring system against external influence |
2.4.26 |
creation of electrical equipment with defect in isolation or switching device for protection against injury from mechanical movement device or motor |
2.4.28 |
creation of electrical equipment switching device noncompliant for particular electrical equipment |
2.4.30 |
creation of electrical equipment noncompliant with Australian Standard |
2.4.34 |
creation of defective earth electrode |
2.4.35 |
creation of defective earthing conductor |
2.4.41 |
creation of earthing system that failed earth continuity and resistance test under AS 3017 |
2.4.42 |
creation of wiring or installation that failed insulation resistance test under AS 3017 |
2.4.43 |
creation of wiring or installation that failed polarity test under AS 3017 |
2.4.46 |
creation of wiring or installation that failed RCD test under AS 3017 |
2.4.47 |
failure to test installation or give required test report |
2.4.48 |
failure to comply with direction to make installation or work safe |
Building Assessor
2.8.5 |
failure to comply with applicable code of practice |
43(4) |
Any other breach where a demerit ground is not identified |
55 1(b) |
the licensee, knowingly or recklessly, gave someone information in relation to a construction service provided, or to be provided, by the licensee that was false or misleading in a material particular; |
Next page . . . . Previous page . . . . Speeches . . . . Contents . . . . Debates(HTML) . . . . PDF . . . . Video