Inspection Type

Googong Dam

Bendora, Corin & Cotter Dams

Lower Molonglo Storage Dam

Dam Consequence (Hazard) Category

Extreme

High

Low

Comprehensive Surveillance and Reporting

Five yearly

Five yearly

Not specified

Safety Reviews

15 yearly

15 yearly

15 – 20 yearly

Independent Peer Reviewer report on the Safety Review

Prior to acceptance of a Safety Review by the Utilities Technical Regulator

Independent audit of dam owner’s surveillance program

10 yearly – This is an audit of the type and frequency of monitoring and inspections conducted to ensure the continuing appropriateness of dam monitoring and inspection programs and the adequacy of surveillance evaluation and reporting.

(4)  Surveillance activities have most recently been completed as noted in Table 2 below.

Table 2: Date of most recent audits

Inspection Type

Bendora Dam

Corin
Dam

Googong Dam

Lower Molonglo Storage Dam

Routine Visual inspections

Conducted at the frequency required by Table 1 above

Intermediate Inspections and Reporting

Conducted at the frequency required by Table 1 above

Comprehensive Surveillance and Reporting

July 2017

April 2017

May 2014

June 2017

Safety Reviews

Supporting studies have been completed. However Icon Water has not completed formal Safety Reviews for these four dams.

Independent Peer Reviewer report on the Safety Review

Not completed

Independent audit of dam owner’s surveillance program

June 2015

Icon Water is working towards compliance with current regulations. In this respect Icon Water has confirmed that it has engaged experts in the field of dam design, construction and safety to complete Dam Safety Reviews and the Independent Peer Reviewer’s Reports. Icon Water has advised that these will all be complete by December 2018.

Cotter Dam was commissioned in 2013/14. The designer’s Construction Report and Independent Peer Reviewer’s Report on the construction report confirmed that the dam was safe at the time it was commissioned. A further Safety Review is not needed until approximately 2028/29.

(5) As required by the ACT Dam Safety Code 2014, Icon Water is responsible for the program of surveillance needed to demonstrate continuing safety of its dams.

(6) Icon Water conducts routine inspection using its own staff. However it engages consultants that are recognised experts in the field of dam design, construction and safety to complete Dam Safety Reviews and the Independent Peer Reviewer’s Reports.