(2) What is the timetable for the implementation of the proposals outlined in the Stromlo Forest Park Master Plan of (a) Molonglo District playing fields, (b) enclosed oval, (c) “The Village”, (d) tourist accommodation, (e) Stromlo pool, (f) Stromlo Boulevard and access, (g) multi-purpose amphitheatre, (h) finish bowl, (i) gondola to the summit of Mount Stromlo, (j) BMX racecourse, (k) jumping/dirt park, (l) the playground, (m) criterium extension/long board skate, (n) cross country running track, (o) sister pavilion/Link Bridge, (p) Adventure Gravity Sport, (q) improved access to the Bushfire Memorial, (r) link to the National Arboretum, (s) enhancing existing trails, (t) 12km road cycling circuit, (u) new equestrian trails and (v) realignment of the Bicentennial National Trail.
(3) If there is no timetable to implement any of the proposals referred to in part (2), is there a priority list for possible implementation; if so, which proposals have a higher priority for implementation in the future.
(4) Have any feasibility studies been conducted into any of the proposals referred to in part (2); if so, what are the findings and cost of those studies.
(5) Have any environmental studies been conducted into any of the proposals preferred to in part (2); if so, what are the findings and cost of those studies.
(6) What is the expected cost of (a) constructing and (b) maintaining a gondola to the summit of Mount Stromlo.
(7) What analysis has been done to determine if a gondola is required and would be patronised.
(8) Have any studies been done of the number of cyclists who use the bus provided at peak periods at Stromlo Forest Park; if so, what are the findings of those studies.
Mr Barr: The answer to the member’s question is as follows:
(1) The draft Stromlo Forest Master Plan was reviewed and finalised in 2014 at an approximate cost of $120,000.
(2) Implementation timetables below.
a. |
Subject to consideration in future budget rounds; |
b. |
Design funding appropriated; |
c. |
Subject to consideration in future budget rounds; |
d. |
2020-21; |
e. |
Construction is to commence in 2017 and be completed in 2019; |
f. |
Subject to consideration in future budget rounds; |
g. |
Subject to consideration in future budget rounds; |
h. |
Subject to consideration in future budget rounds; |
i. |
Subject to consideration in future budget rounds; |
j. |
Subject to consideration in future budget rounds; |
k. |
Subject to consideration in future budget rounds; |
l. |
Completed; |
m. |
Subject to consideration in future budget rounds; |
n. |
Subject to consideration in future budget rounds; |
o. |
Subject to consideration in future budget rounds; |