Cotter precinct: planning.

13

10

14

Water Purification Plant: Cost.

13

13

13

Cotter precinct: Recreation

11

17

18

Murrumbidgee to Googong: .Water quality

11

49

56

Tantangara Transfer: Water Licence

11

9

13

Enlarged Cotter Dam: Fish

10

11

20

Enlarged Cotter Dam: Water quality

9

8

11

Enlarged Cotter Dam: Energy use / greenhouse

7

6

8

Enlarged Cotter Dam: Noise/dust/odour

7

17

17

Water Purification Plant: Drought.

7

7

7

Googong Dam Spillway: ..Recreation

6

4

6

Murrumbidgee to Googong: .Power infrastructure

6

8

9

Water Purification Plant: DA / EIS.

6

15

18

Cotter precinct: consultation.

5

117

117

Water Purification Plant: Environmental river flows.

5

6

8

Cotter precinct: other.

4

3

4

Enlarged Cotter Dam: water restrictions

4

4

4

Googong Dam Spillway: New Googong Township

4

4

4

Murrumbidgee to Googong: .Angle Creek users

4

7

7

Murrumbidgee to Googong: .Noise/dust/odour

4

6

7

Murrumbidgee to Googong: .Traffic

4

6

6

Cotter precinct: Friend of the Cotter..

3

2

3

Googong Dam Spillway: Water service

3

3

3

M2C/CPS: Consultation..

3

2

3

Murrumbidgee to Googong: .Fish

3

27

27

Enlarged Cotter Dam: Drought

2

2

2

Googong Dam Spillway: anti-social behaviour

2

1

2

Murrumbidgee to Googong: .Drought

2

2

2

Salt Reduction Scheme: SRS options

2

2

2

Tantangara Transfer: Cost...

2

1

2

Tantangara Transfer: Environmental Flows...

2

4

4

Cotter precinct: cost..

1

1

1

Cotter precinct: Noise/dust/odour

1

1

1

Enlarged Cotter Dam: Staff behaviour

1

3

3

M2C/CPS: Environmental flows

1

2

2

M2C/CPS: Water quality

1

1

1

Murrumbidgee to Googong: .Energy use / greenhouse

1

1

1

Water Purification Plant: Energy Use / greenhouse.

1

1

1

Water Purification Plant: Fish.

1

4

4

Water Purification Plant: Traffic.

1

1

1

Events Matching Search

1194

778

2403

General awareness of the projects is high, with 96% of respondents to a random survey in 2008 stating they were aware.

Handout surveys during community events and shopping centre displays in the summer of 2008-09 showed the following awareness levels of each of the projects:

• Enlarged Cotter Dam:

478 (73%)

• Murrumbidgee to Googong Water Transfer:

327 (50%)

• Demonstration Water Purification Plant:

215 (33%)

• Tantangara Transfer:

117 (18%)